TRC system specification ?

boleyd

Well-known member
I was trying to understand EIT which I discovered is Enhanced Interlocking Towers. Then within the instruction I found "trc system specification". Does anyone know what this is?:confused:
Dick

 
Hi Dick

I believe it is a system for controlling barriers at road crossings which can work alone or be integrated with EITs.

Regards

Brian
 
EITs have the option to specify compatibility with the TRC crossing system. If you don't use those crossings then simply set the TRC option to 'off.'

John
 
Hi.

Just to confirm that by default TRC crossings are not compatible with standard ITs from N3V. EITs has included an option, that if enabled makes EIT compatible with TRC crossings. In fact when the TRC option is enabled, the EIT will at initialization ignore and skip any TRC crossing included in a path and will let the TRC system still manage the crossing. If the TRC option is disabled, the EIT does exactly the same things than standard ITs and will manage all the crossings along a path.

Hope this helps understanding the relation between EITs and TRC crossings.

Regards.
Pierre.
 
Back