NJCurmudgeon
New member
I am using bendorsey's Swing Bridge 32 <kuid2:210518:1268:1> and am having an issue connecting the track. I am using JR MS Conc1 (Terrain) <kuid2:45324:38015:1> for the tracks on either end. When I attach them, however, the invisible track on the bridge turn into the JR MS Conc1 track. I've tried using other tracks but all have the same result regardless of which way I connect them (starting at the bridge or starting off the bridge and connecting to it). The bridge is the idea length and has the four tracks I need.
I am assuming given how these bridge assets would normally be used there has to be a way to connect up while preserving the invisible track?
Thanks!
				
			I am assuming given how these bridge assets would normally be used there has to be a way to connect up while preserving the invisible track?
Thanks!