Hello all, I have recently encountered a biiiiiggggg Problem. 
On one of my Routes, I have a Standard Gauge Railroad that moves logs a long Distance to a Sawmill.
I was SO CLOSE to getting the Track wrapped up, when I tested a Train with the 'Diesel 3NG Log Dump' using Re-gauged Track...
Not even the Flatcars Clear it. IT SUCKS
So now, I've got a route in Danger of being held off for a While unless somebody can point my the Right way.
Specifically, I need ANYTHING, even a Multiple Industry, that accepts:
32ft_logset
32ft_logstack
Any Help is SERIOUSLY wanted.
Sampug394

On one of my Routes, I have a Standard Gauge Railroad that moves logs a long Distance to a Sawmill.
I was SO CLOSE to getting the Track wrapped up, when I tested a Train with the 'Diesel 3NG Log Dump' using Re-gauged Track...
Not even the Flatcars Clear it. IT SUCKS
So now, I've got a route in Danger of being held off for a While unless somebody can point my the Right way.
Specifically, I need ANYTHING, even a Multiple Industry, that accepts:
32ft_logset
32ft_logstack
Any Help is SERIOUSLY wanted.

Sampug394