A AdvancedApproach Well-known member Oct 25, 2024 #1 I placed a type 5 permissive dwarf signal leading up to the industry. My intent behind that was to allow two trains max entry on this line. Now is this an improper or proper setup?
I placed a type 5 permissive dwarf signal leading up to the industry. My intent behind that was to allow two trains max entry on this line. Now is this an improper or proper setup?