knifeswitch1
Jointed Rail
Time to bring this one out of the archives..
On December 2, 1972, LIRR RF41 rolls through Mineola bound for Holban yard with a 47 car train of loads. The two RS3s only have 5 more years left on the railroad until the GP38-2s and MP15ACs are delivered in April of 1977.

On December 2, 1972, LIRR RF41 rolls through Mineola bound for Holban yard with a 47 car train of loads. The two RS3s only have 5 more years left on the railroad until the GP38-2s and MP15ACs are delivered in April of 1977.