Hi hope it is possible
I have two tracks merging into one .
At a interlocking tower
Both tracks have a mission code.
Is it possible for track one to have priority over track two at the Interlocking Tower.
When track two has set the path but is not on it.
Track one is slightly behind by a few seconds and has to wait for track two clear.
Hope this makes sense