I'm looking to hook up with someone (preferably in the Chicago, IL area) that would be willing to help me with a huge project that I am working on in TS2009 Surveyor. This project, when finally finished, will be a tribute to my father and a very dear friend. My father and my friend both worked for the railroad - my friend was an engineer and my father was an engine mechanic.
The project I'm working on is going to take me an extremely long time to complete, especially with no help. The project, when finished, will encompass all train lines in the state of Illinois, and trains connecting to Indiana, Michigan, and Wisconsin. The connecting trains for Wisconsin will only go as far as Madison and Milwaukee areas. The Indiana and Michigan connections will only be around Lake Michigan - especially the train yards within about 25 miles of Lake Michigan.
So far, I have most of the shoreline done for Lake Michigan from Lincoln Park (Chicago neighborhood) going south to Indiana, and up into Michigan to approximately the same area (straight across the lake from Lincoln Park (Chicago).
I do not have any industries setup around the lake yet. I can't seem to get the shore setup correctly - especially for beaches, boat harbors, etc. I could certainly use some help to get these areas setup correctly, as well as help with the river systems in and around Chicago, Indiana, etc., where there are industries along the rivers that require trains and barges/ships, etc. for the various types of industries located along the rivers.
I don't know how to upload my "layout" to the dls. I don't even know where to find it (on my hard drive), as I'm running Windows Vista Ultimate.
I'm also having trouble finding various types of industries that are located in the Chicago area in the dls. Any and all help would be greatly appreciated.
The project I'm working on is going to take me an extremely long time to complete, especially with no help. The project, when finished, will encompass all train lines in the state of Illinois, and trains connecting to Indiana, Michigan, and Wisconsin. The connecting trains for Wisconsin will only go as far as Madison and Milwaukee areas. The Indiana and Michigan connections will only be around Lake Michigan - especially the train yards within about 25 miles of Lake Michigan.
So far, I have most of the shoreline done for Lake Michigan from Lincoln Park (Chicago neighborhood) going south to Indiana, and up into Michigan to approximately the same area (straight across the lake from Lincoln Park (Chicago).
I do not have any industries setup around the lake yet. I can't seem to get the shore setup correctly - especially for beaches, boat harbors, etc. I could certainly use some help to get these areas setup correctly, as well as help with the river systems in and around Chicago, Indiana, etc., where there are industries along the rivers that require trains and barges/ships, etc. for the various types of industries located along the rivers.
I don't know how to upload my "layout" to the dls. I don't even know where to find it (on my hard drive), as I'm running Windows Vista Ultimate.
I'm also having trouble finding various types of industries that are located in the Chicago area in the dls. Any and all help would be greatly appreciated.