Hey all.
I'm looking for some bridges where I can match up the tracks on the bridges to those of my main line. For example, I'm working on a railroad main line and a subway route (they run side by side in the same ROW area). I've seen a few built-in content bridges that I rather like, like the "Bridge Concrete 2t" or the Austin bridge.
The problem is that when I place the bridge track spline down, then line it up with my mainline (2 tracks rail, 2 tracks subway), the tracks on the bridge deck don't match. The tracks on the concrete bridge is "1 track no gravel" while I'm using "Auran 2009 track" for my mainline and "ChiBos 3rd Rail" for my subway tracks.
I'd like to know how to get the bridges to match my tracks. Especially subway tracks because of the 3rd rail. If I want to use other tracks in the future, I'd like to be able to change the bridge deck tracks to match whatever track I'm using.
Hope that made sense. It looks really out of place to have subway lines cross a bridge without a 3rd rail.
EDIT: I'm using TRS 2009 and CM2.
I'm looking for some bridges where I can match up the tracks on the bridges to those of my main line. For example, I'm working on a railroad main line and a subway route (they run side by side in the same ROW area). I've seen a few built-in content bridges that I rather like, like the "Bridge Concrete 2t" or the Austin bridge.
The problem is that when I place the bridge track spline down, then line it up with my mainline (2 tracks rail, 2 tracks subway), the tracks on the bridge deck don't match. The tracks on the concrete bridge is "1 track no gravel" while I'm using "Auran 2009 track" for my mainline and "ChiBos 3rd Rail" for my subway tracks.
I'd like to know how to get the bridges to match my tracks. Especially subway tracks because of the 3rd rail. If I want to use other tracks in the future, I'd like to be able to change the bridge deck tracks to match whatever track I'm using.
Hope that made sense. It looks really out of place to have subway lines cross a bridge without a 3rd rail.
EDIT: I'm using TRS 2009 and CM2.
Last edited: