Ahh ...Forget ... No one will ever invent a 4 trackside asset that locks on to a single track, and automaticly has 4 parallel spline points that will self gauge a multitrack railroad track ... I have talked myself blue in the face, and people keep pointing out some ancient 2004 asset, that has stupid rotating pushpins, and doesn't lock onto a track at all, because it is a static building asset.
Here's one invention of mine using a 45 Degree angle tool that locks on to the #1 track :
Even GFishers "PRR Track Guide" has 8 spline points, instead of a simple 4 spline points ... what is so hard to understand about a 4 track, 4 spline point way gauge, that has 4 track lock on spline points ? ? ? So one can connect 4 tracks parallel to the first of the 4 tracks.
And at a close 4m spacing ... not some stupid 5.575m UK broad gauge spacing, with only 3 tracks, having 6 redundant spline points.
"MB Finescale Quad 4m" needs an independant 4 track spline point trackside way gauge, similar to GFishers "PRR Track Guide" but with only 4 spline points ... not 8 spline points.
You just don't get it ! ... And we probably never will !