I have an issue in my route that is so puzzling. I have included a diagram below and I will attempt to explain my problem.
I have an industry located several blocks down the line. I have added a "Drive Via Bypass Industry" to all trains that do NOT use the industry. Now, there are several signals between this "Drive Via" and Signal 1. However, if there is a train between Signal 1 and the "Drive Via" (Train "B" for example), Train "A" will NOT drive forward until Train "B" has reached or gone past the "Drive Via" marker, EVEN IF ALL SIGNALS between are green.
Can someone explain what is wrong here? I have racked my brain trying to solve this irritating problem. I have ripped up all track and laid fresh track, changed out my signals, etc., but the trains all behave this same way.
I have an industry located several blocks down the line. I have added a "Drive Via Bypass Industry" to all trains that do NOT use the industry. Now, there are several signals between this "Drive Via" and Signal 1. However, if there is a train between Signal 1 and the "Drive Via" (Train "B" for example), Train "A" will NOT drive forward until Train "B" has reached or gone past the "Drive Via" marker, EVEN IF ALL SIGNALS between are green.
Can someone explain what is wrong here? I have racked my brain trying to solve this irritating problem. I have ripped up all track and laid fresh track, changed out my signals, etc., but the trains all behave this same way.