I've successfully set up several industry tracks and thought I had them figured out for the most part but... now I'm stumped.
I've used BI and BI2 track from pro routes, set production & initial to max. Every time it only fills the 1st five gondolas of the consist and the train comes to a super slow crawl under 1mph. Speed signs are set to 10 mph. The gondolas are configured for limestone just like the track is configured to produce. Any ideas?
Thanks.
P.S.
I hope industry track and waybills are looked at closely in TRS2009. These items are clumsy and hard to follow in TRS2004. I've spent a lot of hours reading the forums, studying tutorials, experimenting in Surveyor, and industry track is still quite difficult to grasp completely. I would like to hear some of the old experienced pros admit there could be a simpler way to approach loading and unloading freight.
I've used BI and BI2 track from pro routes, set production & initial to max. Every time it only fills the 1st five gondolas of the consist and the train comes to a super slow crawl under 1mph. Speed signs are set to 10 mph. The gondolas are configured for limestone just like the track is configured to produce. Any ideas?
Thanks.
P.S.
I hope industry track and waybills are looked at closely in TRS2009. These items are clumsy and hard to follow in TRS2004. I've spent a lot of hours reading the forums, studying tutorials, experimenting in Surveyor, and industry track is still quite difficult to grasp completely. I would like to hear some of the old experienced pros admit there could be a simpler way to approach loading and unloading freight.