hello to all members: I tried to make it clear as possible 
questoin 1
as I run my 2 mile train and if it comes over a crossing grade the cars are suppose to stop after the train has past. right now I'm not makeing too much sense I will try and say it again. how can I make the cars stop at a crossing when I'm running a 2 mile long train after so many minutes the cars begin to cross the track while I'm still crossing the crossing grade. how can I tell the cars to stop after the 2 mile long train has past?
question 2
I have downloaded a switch yard kuid 30671:1000000263:1 called um switch yard ok its a layout so what I want to do is to move that layout within another layout that I built and stick the um switch yard layout under one of my layouts maybe a make it a session.
the below statement may make it a little clearer to understand what i'm trying to say.
is that possible by makeing the layout (in this case um switch yard) and sticking it under another layout that I built and called that um switch yard a session.
brakemen

questoin 1
as I run my 2 mile train and if it comes over a crossing grade the cars are suppose to stop after the train has past. right now I'm not makeing too much sense I will try and say it again. how can I make the cars stop at a crossing when I'm running a 2 mile long train after so many minutes the cars begin to cross the track while I'm still crossing the crossing grade. how can I tell the cars to stop after the 2 mile long train has past?
question 2
I have downloaded a switch yard kuid 30671:1000000263:1 called um switch yard ok its a layout so what I want to do is to move that layout within another layout that I built and stick the um switch yard layout under one of my layouts maybe a make it a session.
the below statement may make it a little clearer to understand what i'm trying to say.
is that possible by makeing the layout (in this case um switch yard) and sticking it under another layout that I built and called that um switch yard a session.
brakemen