Sharing a birthday moment
On 2 February 1978, Truett transited the Suez Canal and operated with the Middle East Force in the Red Sea and Gulf of Aden during the Ethiopian/Somalian crisis. Her operations there included a 56-day, continuous at-sea period. Returning to the Mediterranean in April, Truett arrived back in Norfolk on 25 April. The summer was spent conducting operations off the east coast, and the fleet frigate then proceeded to Braswell Shipyard, Boston, for a regular overhaul which commenced on 27 September. The ship remained there into 1979. Yes I am a sailor!