This is a continuation of this thread, sort of . . . 
http://forums.auran.com/trainz/showthread.php?t=64370
This time a slightly different layout, took the 30m shuttle data for the Twin Ports, raised the topography by 200m to add a little more relief. Will have a couple of swing/lift bridges, 3 ore docks modeled after the original ones @ Superior, several large grain elevators, a coal unloading facility (Huletts), an open-pit iron ore mine, and a bunch of other assorted things.
My idea was to manufacture a scenario that could be used with either diesel or steam - so circa 1910- 1970's or so??
I may have to make another smaller layout for a really early period - 1880's.
In these views the loco should have been pushing loaded cars onto the dock - did not set it up correctly.
		
		
	
	
		
	
		
	
				
			http://forums.auran.com/trainz/showthread.php?t=64370
This time a slightly different layout, took the 30m shuttle data for the Twin Ports, raised the topography by 200m to add a little more relief. Will have a couple of swing/lift bridges, 3 ore docks modeled after the original ones @ Superior, several large grain elevators, a coal unloading facility (Huletts), an open-pit iron ore mine, and a bunch of other assorted things.
My idea was to manufacture a scenario that could be used with either diesel or steam - so circa 1910- 1970's or so??
I may have to make another smaller layout for a really early period - 1880's.
In these views the loco should have been pushing loaded cars onto the dock - did not set it up correctly.
	
	
			
				Last edited: