Double track trouble

thepeartree

New member
I'm working with 2004. I admit that in this case I'm clueless about a solution. Here's the problem: I can't get Surveyor to create turnouts using double track any of the ways I can with single-track. I tried every method that should work and it just ignores me.

Anyone have any wisdom to pass on?
 
You have to connect at the spline points. Leave a gap between splines and use a single track spline to make the turnout and to complete the track section.

Johnny
 
Use double track and quad track only as a preliminary track spacing tool guide...whem you are satisfid with your route delete one section at a time, and replace it with single track...multiple track splines :p
 
Hello

I know I'm reviving an old thread but maybe someone can help me as the solution provided isn't too helpful here...

I'm creating an elevated suspended monorail system as shown below...

jjqburch_20130101_0005_zps7b7bc92a.jpg


jjqburch_20130101_0000_zps9492a573.jpg


At the moment it's the old KIND: BRIDGE. Is there a way to make double track using a LOD configuration? I haven't kept up to date with developments so wondering if anything's been implemented yet?

Also, is the 'straigten track' tool supposed to work with splines made as KIND: BRIDGE? How do you normally make double track straight?

Thanks

Jonny
 
Use two single track lines. Not recommended used "double track". This is 2 single lines + invisible track...
Pic looks cool. Trainz future is light...:D

Am sorry for my english
 
Back
Top