Driver_Col
Well-known member
I run a number of trains (in TC3) on varying schedules and often move from one train to another (probably typical!) and have a couple of questions re AI operations:
1. Is there any way of modifying an AI schedule without going through the "Abandon Schedule" and then re-creating process? Example: A mid-point wait time needs to be increased.
2. Is there any way of knowing how much "Wait time" is left for a train? Example: I move to a train which is in a station and would like to know how soon it will be moving out.
Many thanks. Colin
1. Is there any way of modifying an AI schedule without going through the "Abandon Schedule" and then re-creating process? Example: A mid-point wait time needs to be increased.
2. Is there any way of knowing how much "Wait time" is left for a train? Example: I move to a train which is in a station and would like to know how soon it will be moving out.
Many thanks. Colin