lonnieguthrie
New member
First off I have done a search and can't seem to come up with an answer that works. I have plenty off signals with speed signs placed at each signal. I also have all junctions set to the correct path so there are no yellows ahead. When I place a speed sign say a reduction of speed from 60 mph to 30 mph before a town the train slows way to early as much as a mile before the speed sign. Very unrealistic. I'm using CSX Speedboard Signs in TRS2010. I've tried different speed signs with different spacing but nothing seems to help. Is there any way to use Triggers to solve this problem or is there another solution? Frustrated here in Illinois you might say. Hard to maintain my schedules when the trains slow unnecessarily so early. I can' figure out a work around. I wish there was something I could change in the speed signs TXT file to change the radius that the train see's it or something in the engine file that adjusts how far ahead the train looks at speed signs. Thanks for any help that you might have.