AI and Junction problem !!!

Tromben

New member
I have station with 4 track, 2 track go north and 2 go South. When that are one train in station and that come more train will pass this train in station, that work, but PROBLEM are: then go close to junction are before,when that are red and junction are wrong direction and this train will pass nearly stop before the junction change and train can pass station and train in station...

I have Signal BR 4, some have solution of this problem i will junction change early, and not with Driver Command ???



...........................................Station
.................................... junc ............. junc
...................................../========\
===========================================
===========================================
.....................................\========/
.................................... junc .............. junc

.
.
.
.
 
Last edited:
For trains you don't want to stop at the station.
Put a track mark between the junctions and use the navigate via track mark command.
Also in surveyor set the junctions for straight through not via the platform.
 
Train go pass nearly stop before junction not between junction (in station)........

Problem are if that this track train have stop in station on, Train pass but slow down close to junction, after that junction change, i will junction change early and take the free way , sometimes that can was 2 train in station i dont will stop up traffic with wrong track that be with trackmark in station i will train only pass not slow down if that are free track on station....
 
Last edited:
You also need a signal between the junctions.
They slow down because track ahead unsignalled.
 
Sometimes too many conflicting signals prevent AI from running ... try deleting or moving one of the signals, or by adding a Drive To/Via Trackmark, and name it. Are your switchs named, and levers fiddled with, back and forth ?

Does it display that one of your track ends is open, with no path
 
Last edited:
Station is a 4 track station, that come was 2 passenger train at some times and pick up passenger.

ex. that are 3 train on same direction,the first 2 are passenger train and they stop on track 1 and 2 , after that come that heavy freight train, 1 train leave the station, do will i not the freight train slow down if 1 one track are free, do most junction change in time.

This Route and Session come that was lot of traffic both passenger and freight train.
 
Back
Top