Hi everyone.
This is my first ever post!
I've been working hard building a real scale route in T:ANE and I've come across an issue which i can't solve. Figured a few out myself but this one has me stumped.
I'm using the J.R. Diamond River Summerlee coal tipple. If i run a train through it at an appropriate speed it loads perfectly but if i ask an A.I. driver to do it i run into problems. Mostly they will start off ok at about 2mph but by three or four cars in they slow down to 1mph and then stop showing a ! in the driver icon. Usually they manage to load between 5 or 6 cars before this happens. I have laid the track in the direction of travel and the train has enough space beyond the mine to complete the move. In order to check if it was the way something specific was laid out that was causing a problem i set up a simple test on a blank board with a very basic track layout and no junctions or signals. This time the train ran the first car or two through too quickly to load and then commenced loading at around car three before again stopping at around car six and putting up the ! again. I feel as though i may be missing a little bit of vital knowledge so if any one can point me in the right direction I'd be delighted. Thanks for reading this. Cheripok (David).
This is my first ever post!
I've been working hard building a real scale route in T:ANE and I've come across an issue which i can't solve. Figured a few out myself but this one has me stumped.
I'm using the J.R. Diamond River Summerlee coal tipple. If i run a train through it at an appropriate speed it loads perfectly but if i ask an A.I. driver to do it i run into problems. Mostly they will start off ok at about 2mph but by three or four cars in they slow down to 1mph and then stop showing a ! in the driver icon. Usually they manage to load between 5 or 6 cars before this happens. I have laid the track in the direction of travel and the train has enough space beyond the mine to complete the move. In order to check if it was the way something specific was laid out that was causing a problem i set up a simple test on a blank board with a very basic track layout and no junctions or signals. This time the train ran the first car or two through too quickly to load and then commenced loading at around car three before again stopping at around car six and putting up the ! again. I feel as though i may be missing a little bit of vital knowledge so if any one can point me in the right direction I'd be delighted. Thanks for reading this. Cheripok (David).