If only we could build a flat base as scenery. Then attach tracks using attachment points. without it being permanently stuck to the floor
TRS 2004
Stevep100
Hi all
I want to make a bridge spline with more than 2 attached tracks on it the model is made and two inner tracks are attached at trackoffsets -2.5, 2.5 I want to add 2 more tracks at -9.5, 9.5 but I dont know how to add them in the config any help please
thanks Stevep
Hi all
A simple question about scale I would like to design a layout in N scale with a view to creating it in the real world later I will use a base of 8' by 4' and I would like to know how to mak this out in surveyor. Do I use the rulers in N scale mode at 8' by 4' or do I measure out 8' by 4'...