First, I am running TRS2006.
Is there a way to find out or a guide maybe to tell what commodities can and will be loaded from what trackside industries into what rolling stock? For example, I set the logging company trackside industry on my route, but no matter what rolling stock I pull up...
I have read:
http://forums.auran.com/trainz/showthread.php?t=34414&highlight=double
And I have read the track laying tutorial here: (Very Good)
http://forums.auran.com/trainz/showthread.php?t=5728&highlight=laying+track
And I completely understand why laying single tracks side-by-side to...
Anyone have any idea what happened to this website? Was it a good Trainz site? I saw it on GAURC's links list. When I try to visit it, it calls me a "file snooper" and lists an IP address that isn't even mine. LOL!
I am building a fictional American railroad and I was wondering about what I should name my switches, junctions, sidings and tracks. Is there a standard naming convention that is normally used?
I am unsure if this is a problem with my specific setup or not, but none of the built-in sesions are working. For exapmple: Marias Pass Approach - Amtrak Nr 7 session.
1. The clock is at 12:05:14 and it never moves.
2. None of the AI trains do ANYTHING at all... they all just sit there. I jump...
What are the easiest ways to measure both distance (like where to place my mile marker signs) and/or to measure the total amount of track I have laid down (including things like sidings) in the route I am building?