It might not look much but this is my attempt to model the Victoria Bridge at Penshaw on the Leamside Line and it consumed about 6 hours work. The next step is to figure out if I can reskin the Arched Viaduct Kit to look like the SAM Bridge Abutments. The real bridge took just 2.25 years to build , opening in June 1838 and cost the equivalent of £3.72 million in modern money. In typical BR fashion it was refurbished in 1989 and the line closed 2 years later.
Victoria Bridge NER C Class 6.5.24 by A1 Northeastern, on Flickr
Victoria Bridge NER C Class 6.5.24 by A1 Northeastern, on Flickr