This thread is for showing parts of my East Broad Top RR - clearly a work in progress with very little scenery on it to see - at present. However since I'm aware of at least 2 other large EBT projects currently working I thought it might be good to have a thread where we can compare notes so to speak. So anyone working on an EBT route for Trainz is invited to post screen shots in this thread.
I'd ask all others to refrain from posting any pics in this thread. This is for pics of EBT routes currently being made for Trainz and only those - thanks for your cooperation.
I'll start with a bunch of shots taken in the Mt Union, Pa area. The largest of the EBT's 3 main yards was located here and it was a mix of ng3', sg and dg track. There were 3 brick factories producing refactory bricks, a creosote plant that made ties (sleepers) for the PRR and the EBT's own Chance Coal Process Plant for cleaning, sorting and load coal into both sg and ng hoppers. So several large industries were located there and it was also the EBT access to the rest of the world with it's interchange with the PRR.
Bob Pearson
I'd ask all others to refrain from posting any pics in this thread. This is for pics of EBT routes currently being made for Trainz and only those - thanks for your cooperation.
I'll start with a bunch of shots taken in the Mt Union, Pa area. The largest of the EBT's 3 main yards was located here and it was a mix of ng3', sg and dg track. There were 3 brick factories producing refactory bricks, a creosote plant that made ties (sleepers) for the PRR and the EBT's own Chance Coal Process Plant for cleaning, sorting and load coal into both sg and ng hoppers. So several large industries were located there and it was also the EBT access to the rest of the world with it's interchange with the PRR.
Bob Pearson