In my present project I have a puzzling and niggling hitch that I cannot seem to solve. It is a single line that has a loop into double track then goes back to single.
Going from left to right along the main line when a train gets to the junction and the green arrow is set for the left main track it however ignores that and goes onto the loop which is set with the red arrow? To get a train to go as it should I have to switch the junction arrow to red for the main line and the train will go through the red arrow! Signalling adds to the confusion. The signal on approaching the loop when you click on it will tell me the line terminates or is unsignalled (but it is signalled) when set for green arrow. That doesn't happen on the loop if you get the gist of this?
Left to right direction
--------------------------------------------------------------------------
\..................................................../
Going from left to right along the main line when a train gets to the junction and the green arrow is set for the left main track it however ignores that and goes onto the loop which is set with the red arrow? To get a train to go as it should I have to switch the junction arrow to red for the main line and the train will go through the red arrow! Signalling adds to the confusion. The signal on approaching the loop when you click on it will tell me the line terminates or is unsignalled (but it is signalled) when set for green arrow. That doesn't happen on the loop if you get the gist of this?
Left to right direction
--------------------------------------------------------------------------
\..................................................../