Am using GWR single and double track crossings (K:46219:24070:1 & 24075:1) on a WIP. Both are working well on the approach of a train BUT what is the approved method (if one exists for these assets) of varying/regulating the train approach/departure distance before the gates close/open.
At present a locomotive just parked up on a connecting track within say 500 -800 scale metres will cause the gates to remain closed against the road traffic. Am sure I have read something about crossing controls but cannot find it. Can anyone point me in the right direction?
Many thanks
John
At present a locomotive just parked up on a connecting track within say 500 -800 scale metres will cause the gates to remain closed against the road traffic. Am sure I have read something about crossing controls but cannot find it. Can anyone point me in the right direction?
Many thanks
John