I have several situations where more than one kuid is used for what is essentially the same asset. This is mostly due to bringing a route from TRS2010 into TRS2019, where the asset was built-in to the new product and I had a modified equivalent on the old route. Most of these assets are signals or trackside components, and are named with custom names appropriate to identity their locations. I would like to rationalize my kuid list by replacing the old assets with the new built-in ones.
I have not used the bulk asset replacement capability. My question is this -- when I do a bulk asset replacement, is the property name of the old asset retained for the new one? If not, the job becomes a very large one, so perhaps this becomes a suggestion.
I have not used the bulk asset replacement capability. My question is this -- when I do a bulk asset replacement, is the property name of the old asset retained for the new one? If not, the job becomes a very large one, so perhaps this becomes a suggestion.