Level Crossings

Ron_Smith

Member
When placing level crossings (UK single - double and 4 Track) the road was open in all previous usage and track closed (up to TS12) but in 2019 I find the road is closed and track open.
BIG traffic jams waiting to cross track.
Can the original positions be changed ?

There is always someone who knows !!

Ron
 
What build? Newer builds of TRS19 Plus Beta are paused in Surveyor, un-pausing will put the gates back to open for traffic, may be the same for the non Plus beta?
 
Thanks for the info. I have found that in Surveyor the gates are closed to road and open for track BUT in Driver the reverse is the case. Strange but this seems to be the case.

Thanks for the replies.

Ron
 
Gates are closed to traffic at start until the animation sets them up to be open. This is also the case in driver but the animation has already happened by the time you check them out.
 
Back
Top