.
Results 1 to 6 of 6

Thread: Level Crossings

  1. #1
    Join Date
    Nov 2006
    Location
    Australia, Queensland, Bethania
    Posts
    282
     

    Default Level Crossings

    When placing level crossings (UK single - double and 4 Track) the road was open in all previous usage and track closed (up to TS12) but in 2019 I find the road is closed and track open.
    BIG traffic jams waiting to cross track.
    Can the original positions be changed ?

    There is always someone who knows !!

    Ron

  2. #2

    Default

    It helps if we know which crossings you refer to. There are many uk crossings.

  3. #3
    Join Date
    Nov 2008
    Location
    Crewe, Cheshire, UK
    Posts
    15,436
     

    Default

    What build? Newer builds of TRS19 Plus Beta are paused in Surveyor, un-pausing will put the gates back to open for traffic, may be the same for the non Plus beta?
    Malc


  4. #4
    Join Date
    Nov 2006
    Location
    Australia, Queensland, Bethania
    Posts
    282
     

    Default

    Thanks for the info. I have found that in Surveyor the gates are closed to road and open for track BUT in Driver the reverse is the case. Strange but this seems to be the case.

    Thanks for the replies.

    Ron

  5. #5

    Default

    Gates are closed to traffic at start until the animation sets them up to be open. This is also the case in driver but the animation has already happened by the time you check them out.

  6. #6
    Join Date
    Nov 2006
    Location
    Australia, Queensland, Bethania
    Posts
    282
     

    Default

    This all too much for an "old fellow" but thanks again for the info,

    Ron

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •