Work has been progressing at a good rate.
The builders and decorators have been and gone and their work has made a huge difference at the East Yard/Club Room.
First image shows the old Large Pixel area as it is today, now open-plan with spectator viewpoint....
Next image shows the West Yard and now open-plan club room.
New HD walls addded too!
Now we move east to the Railfan area, new floor and new layout surface for the yard on the shelf.
Now to the main layout area where the High Line has received a new retaining wall/trackbed with some scenics added.
(Wall available in the new year)
The Low Line is now 4-track with an extra tunnel, the left lines feed the Hauptbahnhof Terminus, the right lines are through lines.
On the opposite side of the room I have installed 2 new bridges/viaducts. (Second and third - available in the new year)
A new station and town buildings at Vierbruecken.
Finally for today, a new Hauptbahnhof Station Building
That's it, more next year,
Have a Merry Christmas and a Happy New Year,
Cheers,
EM