    I am building new trains for the project and the first one I am working on will be the the new Waratah Series 2 "B" sets which have replaced the now retired "S" sets.



  2. #47
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    Updated picture showing track and ballast for the Sydney Rail Network.....
    I am planning on having different versions of this ballast texture with additional versions adding some realism to what you might expect to see alongside the rail tracks.

    (Example) Small pieces of paper blown onto side of the track by the wind


    Last edited by rjord1; August 3rd, 2019 at 10:08 PM.

  3. #48
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    When you use default rail tracks on the route you get an issue where you create a junction to another rail track and then find you cant visually see which way the points are set. So with today's updated track I have made sure all the points will look like the one shown below.


    Last edited by rjord1; August 3rd, 2019 at 10:21 PM.

  4. #49
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    I noticed my first attempt in creating the Sydney route was not perfect because I picked up anything in Open Street which was a railway..... unfortunately this included rail way platforms.

    So when I exported the rail track to Trainz rail track was created as a loop where the platforms were.

    Other things such as streets or buildings with Railway in the name also had rail track created in Trainz.
    There were too many of these to fix so 3 this morning I started version 2 and this time made sure only rail track was added to Trainz and platforms, streets and buildings were excluded.

    Very happy with the result.

    I am amazed that what took me 2 years to do a decade ago I can do today in a matter of hours...... giving me rail tracks between Springwood, Richmond and Berowra,
    I can remember plotting each rail track in Eveleigh Yards using Google Earth coordinates and that was a pain.

    The picture below showed what OpenStreet and TransDEM did with Eveleigh with much greater accuracy.


    Last edited by rjord1; August 5th, 2019 at 12:25 AM.

  5. #50
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    I am currently downloading TRS19 to see if my system will be able to handle it.
    If it allows me to start building the route as modules then I can get started on the TRS19 version and upgrade the hardware in a few months.

  6. #51
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    I had stalled on the idea of getting TRS19 as the minimum specs required at least 50 Gig of free space....... 50% of my total hard drive.
    And 5 gig of memory........ would it even start.

    The price is also $90 Australian and I didn't want to buy the game outright if it won't run on my computer. A gold membership allows me to download the latest version so I can see if it works on my poor PC. I do have a more powerful computer but it switches off after 10 seconds of getting into windows. Took it to the local computer shop and was told it had computer cancer...... I have worked in computers for 30 years and never heard of computer cancer......

    So I have finally installed TRS19 and I was surprised to find that the game takes just 13 Gig and not the 50 Gig as mentioned. Yes I know I can download all the DLC updates which will probably get me to 50 Gig..... however at this stage I want to design my route so don't need those updates.

    During the next 7 days I am going to do some testing with TRS19 and then look at creating the Sydney network in modules.

    Creating the elevation data and tracks for each module with TransDEM and Open Street is something I will have to trial and then do some testing of merging the modules together.

    One of the huge improvements is how dark the night is..... exactly what I was looking for.
    Less lag on my PC than I was getting with Thane..... another bonus.

    Still early days but so far it looks like I will be able to create the route in the latest version of Trainz.

    Not sure what everyone else is using for their routes.
    If you decided not to use TRS19 for some reason can you let me know so I can see if that effects me.

    I have seen many poor reviews for TRS19...... but I see poor reviews for a lot of games that I like so I don't generally follow reviews.
    Last edited by rjord1; August 10th, 2019 at 03:14 AM.

  7. #52
    Join Date
    Nov 2006
    Location
    Australia, NSW, Katoomba
    Posts
    796
     

    Default

    Enjoyed reading your thread. I have just switched to TRS2019 from TANE, and (so far, and I've done a lot of them)) it has been my most hassle free migration.
    Last edited by FootplatePhil; August 10th, 2019 at 07:08 AM.
    Phil
    WeddinNSW V4 for TRS2019 now on the DLS. All my posted screen shots are from a route you can download for free.

  8. #53
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    Quote Originally Posted by FootplatePhil View Post
    Enjoyed reading your thread. I have just switched to TRS2019 from TANE, and (so far, and I've done a lot of them)) it has been my most hassle free migration.

    Thanks for letting me know you enjoy the thread...... greatly appreciated.
    So far I like what TRS2019 has to offer so looking forward to building the route with it.

    I am about 30 minutes away from having the first module with elevation and track added to the game.
    Then I will create a test module to see how I fit one module with another..... specifically will the rail tracks join up

  9. #54
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    Have got the first module of the route added to TRS19 and my computer is handling it with no issues....... I noticed a number of differences to TANE so working through those.

    With TRS19 the colors appeared to be a little bright or washed out.
    Have been experimenting with the lighting to improve the colors as shown below.

    The rail track shown here is not necessarily the one that is used in this project but is test purposes at least.


    Last edited by rjord1; August 10th, 2019 at 04:30 PM.

  10. #55
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    One morning somewhere in Clyde.......

    The cleaner turns up.... has a look at this and says "You're plumb loco if you think I'm clearing up this mess !!"


    Last edited by rjord1; August 11th, 2019 at 03:10 PM.

  11. #56
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    2 additional modules are being created this week....... by the end of today I will have a module linking the base module to the railway stations at Katoomba and Richmond....... yes I did say Katoomba.

    By Friday I am going to have the next module complete and this will be completing the link between Newcastle and Hornsby.

    With such a vast area I have already decided on how the scenery is going to be layed out and it will be different to the other Sydney routes that are out there.



    Thanks to Open Street and TransDEM I am now back at where I was with the project March 22nd, 2009 and have expanded out to Katoomba and Newcastle as well by end of week.
    Last edited by rjord1; August 12th, 2019 at 06:26 PM.

  12. #57
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    I will be creating custom announcements such as the sound file linked below. This will tell passengers the destination of the train they are boarding and from which platform. All mention of Cityrail services will be dropped from the announcements.

    Link is at Microsoft OneDrive
    https://1drv.ms/u/s!AgNg3YuwkZJPhM5K..._SZ2g?e=Nx4or3

  13. #58
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    Services to Emu Plains now allows additional stops at the following stations:


    Lapstone
    Glenbrook
    Blaxland
    Warrimoo
    Valley Heights
    Springwood
    Faulconbridge
    Linden
    Woodford
    Hazelbrook
    Lawson
    Bullaburra
    Wentworth Falls
    Leura
    Katoomba


    Last edited by rjord1; August 13th, 2019 at 02:45 PM.

  14. #59
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    While I have elevation data applied to the route the detail is not enough to give me terrain that looks like the picture below. While I work from one station to the next I will refer to video from Sydney Trains Cab Videos to fine tune the track side elevation to as realistic as possible.

    These videos will allow me to create additional track-side objects I need for the project.

    A number of these videos are at night and will help me create the night environment.

    10 years ago all I had was Google Earth to try and work out the scenery and elevation......... videos direct from the cab will make this a whole lot easier.

    The vidoes I will be referencing for the project are :

    Richmond to Central
    City Circle
    Emu Plains to Gordon
    Central to Campbelltown via Bankstown
    Central - Olympic Park Loop
    Revesby - Central
    Epping to Waitara
    Clyde - Lidcombe Full Loop
    Liverpool to Central
    Berowra to Central
    Circular Quay to Liverpool via Bankstown
    Epping to Berowra
    Carlingford Branch Line
    Waterfall to Bondi Junction
    Cronulla to Bondi Junction
    Cronulla to Central Empty Night Service
    Campbelltown to Central
    Penrith to Central
    Clyde to Redfern
    Cronulla to Central Night Service
    Redfern - Revesby Trackwork
    Epping to Hornsby via Central
    Eveleigh to North Sydney
    Penrith to North Sydney
    Central to Leppington
    Waterfall to North Sydney
    Hornsby to Town Hall
    Campbelltown to Flemington
    Hornsby to North Sydney
    Kingsgrove Turnback & Homebush
    Revesby to Glenfield
    Hurstville to Bondi Junction
    Sydenham to Bondi Junction
    Penrith to Epping
    Campbelltown to Central (Sydney) Terminal. Night Drive
    Bondi Storage Tunnel Departure



    For the line to Katoomba I will refer to a 2 hour video from NSW Railway Videos

    For the line Central to Newcastle I will refer to the 3 hour video from Alistair Harding whose videos have additional details I can use...... a readout of how fast the train is travelling at each stage of the trip.

    This will allow me to have an idea of how fast the trains travel on each line keeping under the posted speed limits.


    Last edited by rjord1; August 13th, 2019 at 04:26 PM.

  15. #60
    Join Date
    Nov 2006
    Location
    Australia
    Posts
    206
     

    Default

    While TransDEM and Open Street have laid the initial track layout for me I still need to fix the track along each section of the route.

    The level of separation between each track is important to me to get right and I can use these videos to work out the correct separation. I can also use the videos to correctly place the power lines over each track.

    The pictures below details what I can add to my route that I could never have got from Google Earth.







    This picture shows the detail needed to create the Auburn Stabling Yard before heading to Clyde.






    and then arriving at the the back platform at Clyde which is platform 6 which is not for passenger use, is fenced off and is used as a headshunt for the Auburn stabling yard.........