    Quote Originally Posted by RPearson View Post
    The train struggles in the 2nd test because there is an actual increase in train "resistance" is due to the added resistance of the curve.
    The train struggles in the second case because the changed curvature in the lateral plane changes the curvature in the vertical plane. There is no reason that this should happen - it just does.

  2. #17
    Join Date
    Dec 2007
    Location
    Antarctica, Vostok Base, South Pole, AQ
    Posts
    18,717

    Default

    Most grades in and between cities are generally gentle, @ 0.10% to 0.25%, if that

    Although exaggerated, this is how grades look like

    The Top, and the Middle of the 2 Sides, have flattened sections of track, bowing, bending, flexing, the attached lead in/lead out tracks, like rubber



    Last edited by cascaderailroad; February 11th, 2019 at 08:38 AM.

  3. #18
    Join Date
    Oct 2018
    Location
    USA - North Carolina
    Posts
    410

    Default

    Quote Originally Posted by SailorDan View Post
    Not necessarily. The gradient that the train actually experiences is the average over the length of the train. The engine might see more than 2%, the caboose less, but if they average out to 2% then that's what the train experiences. That's why you will often see instantaneous grades that exceed the allowed maximum. If the train is long enough, and the excess grade short enough, the average for the train is still within limits. And if the train isn't long enough then it's unlikely to be too heavy for that short-term excessive grade. So you actually have three grades to consider - the surveyor setting which is an average over spline points, the instantaneous readout from the HUD, and the average over the length of the train.
    Yes.. that makes total sense.

    My "confusion" is here: In the real world someone has to build/construct/lay the rail. I can't rip up lay new gradients for every train that passes, based on length, weight, etc etc.... So, If I know that a gradient needs be MAXIMUM 2% in "worst case" instance for a train to successfully make it up the gradient, what do I tell my construction engineer to go out and build? (As to "gradient" spec???) When I make a layout in Trainz I see myself as a construction engineer. Given a spec to meet. And if I am given a spec of 2% my max gradient will be 2%. Realize this is all in my mind... I have no idea how this is done in reality....

    I owned a hobby store for a number of years and customers building layouts would come in a ask for Woodland Scenics "grade" kits... available in 2%, 3%, and 4%. Two people could "communicate" about the "percent" of the grade....
    Last edited by 1611mac; February 11th, 2019 at 07:35 AM.
    TRS19 98592: Win 10, ASUS B450M-A/CSM, GTX 1060-6 Windforce, 1TB EVO SSD
    also a Mac install


  4. #19
    Join Date
    Nov 2006
    Location
    United States of America, Georgia, Rocky Face
    Posts
    4,050
    Blog Entries
    39

    Default

    If I was to build a 2% grade, I wouldn't have one track spline at 0% and the following one 2%, I'd instead increase the grade over equal lengths of track spline. First spline would be a 0.5% grade, the second 1%, the third 1.5%, and the fourth 2%. It's a long upwards curve instead of just a short upwards curve. When the tracks near the top of the grade, I'd repeat the process backwards. The first spline is 2%, the second 1.5%, the third 1%, and the fourth 0.5%. Now it's a long, downwards curve instead of a short downwards curve. I find this to be an easier way for me to drive a train uphill as I've got more time to react in the change of grade instead of going immediately 0% to 2%. By 'time to react', I mean increasing the throttle settings to prevent me from stalling and having to back down the grade and try again.
    Last edited by jordon412; February 11th, 2019 at 09:39 AM.
    I solemnly swear that I am up to no good - The Marauder's Map Harry Potter and the Prisoner of Azkaban

  5. #20
    Join Date
    Oct 2018
    Location
    USA - North Carolina
    Posts
    410

    Default

    After further examination..
    - One problem I had was that in learning how to use the Gradient tool I was using just one, two, or three splines with gradient set on each. If you apply a 2% gradient on each segment you do indeed get a firm 2% gradient from beginning to end. There is no transition. The first spline ends at zero and the last spline ends at whatever height is proper for the 2% gradient at that length. Start adding "zero" height segments to the transitions and you start getting the transitions on the "zero" level segments along with the gradients.


    But still confused as:
    - It appears that even if you have plenty of length for the end "transitions," transitions go "negative" and then come back to height. It makes no sense to me why a "set" 0.5 gradient (zero to 1.7 meters) 340 meters in length would need to transition into the negative before coming back up to zero at the low end.
    TRS19 98592: Win 10, ASUS B450M-A/CSM, GTX 1060-6 Windforce, 1TB EVO SSD
    also a Mac install


  6. #21
    Join Date
    Dec 2007
    Location
    Antarctica, Vostok Base, South Pole, AQ
    Posts
    18,717

    Default

    My grades go in gradual increasing (decreasing) increments, ie: 0.00%, 0.05%, 0.10%, 0.20%, 0.30%, 0.40%, 0.50%, 0.60%, 0.70%, 0.80%, 0.90%, 1.00% ... etc

    or 0.625%, 0.125%, 0.250%, 0.375%, 0.500%, 0.625%, 0.750%, 0.875%, 1.00%
    Last edited by cascaderailroad; February 11th, 2019 at 03:03 PM.

  7. #22
    Join Date
    Oct 2011
    Location
    New Caledonia
    Posts
    2,618

    Default

    Quote Originally Posted by 1611mac View Post
    So, If I know that a gradient needs be MAXIMUM 2% in "worst case" instance for a train to successfully make it up the gradient, what do I tell my construction engineer to go out and build? (As to "gradient" spec???)
    You can specify that 'my max gradient will be 2%' but you have to decide how you measure it. Gradient is the change in height over a certain length. You need to choose the length you use for that calculation, because it has to be part of the specification. It certainly isn't the very short distance that the HUD uses for its instantaneous gradient figure - perhaps it's just an arbitrary figure, or perhaps it's based on some nominal length of train. If you specify gradient in Trainz when laying track then the gradient is always an average between spline points. That is convenient because it is easy to add, remove and change spline points - no additional information about the gradient needs to be provided. The alternative is to set the spline point height and let the gradient adjust itself - that is convenient when you are working to existing plans.

    If you have two segments with different gradients the transition has to be applied somehow as an adjustment to the nominal grade. In Trainz it is done by distributing the change roughly equally between the existing segment and the new one. That is a simple and sensible option, but it does mean that the grade before an upward transition can become negative. An alternative would be to lock in the grade of an existing section and apply the whole of the transition to the next section as laid. This creates a problem when trying to work out the effects of adding, deleting or moving spline points - the result becomes inconsistent as the system cannot know which segment to apply the gradient change to.
    Last edited by SailorDan; February 11th, 2019 at 03:36 PM.

  8. #23
    Join Date
    Jul 2009
    Location
    Australia, Queensland, Brisbane
    Posts
    327

    Default

    Quote Originally Posted by RPearson View Post
    The train struggles in the 2nd test because there is an actual increase in train "resistance" is due to the added resistance of the curve. This effect happens on curves where there is no gradient - on level track with 0.0% grade. Since TS12 (maybe 10?) curve resistance has been include in Trainz. Typical estimate of the effect in real life is 0.8 x DoC lbf/ton, where DoC is the curve's degree of curvature and ton is 2000 lbf. For railroad curves in the US DoC is usually based on a 100 ft chord length. With a radius of R in ft, the DoC is approx. equal to 5730/R. The effect of curve resistance in Trainz appears to be in that general neighborhood.

    % grade is measured by dividing the rise in the track by the length measured along the track including any curves. It is not measured using rise divided by just the straight distance between the 2 points unless there are no curves between those points.

    Real railroads typically use compensated curves on grades where the grade is reduced thru the curve so the combined effect of the grade and curve are approximately the same as the uncompensated grade resistance. Since the grade resistance is 20 lbf/ton/percent grade, reducing the grade thru the curve by 0.04% x DoC reduces the total resistance by 0.8 x DoC lbf/ton which eliminates the effect of the curve.
    Thank you, Bob. This is thoroughly informative.

    I've never really studied the exact formula, but glad to see I'm in the ballpark. I've always guestimated around 75% (0.75 x DoC lbf/ton) for curves on grades just through "test and measure" while route building.

  9. #24
    Join Date
    Oct 2018
    Location
    USA - North Carolina
    Posts
    410

    Default

    Quote Originally Posted by SailorDan View Post
    Y
    An alternative would be to lock in the grade of an existing section and apply the whole of the transition to the next section as laid. This creates a problem when trying to work out the effects of adding, deleting or moving spline points - the result becomes inconsistent as the system cannot know which segment to apply the gradient change to.
    "Lock in a grade" - I've missed something. I didn't know anything could be "locked." Please explain.

    By the way, let me explain what I'm doing. It's very simple. Making my first route which is a one panel HO layout. Now I know HO layouts are "fantasy" but I want to keep my grade "somewhat" sane/prototypical. I have a track passing over a track. At the passover point the lower track is at -2.5 meters. The top track is a 6 meters. On both ends of both the under and over track I simply want the shortest/steepest grade possible (it is a one panel layout) at roughly 2%. I currently have "2.3" gradient which is totally acceptable. I've seen as high as 6% on small HO panels but I don't want that...

    So my gradients are acceptable and my panel is fine. But that is what got me started on this whole thing. And once I get started I have to understand. I just couldn't see why a 2% specified grade wasn't 2%. I experimented and discovered that a 2% grade spanned 25 10 meter squares and so I began on that figure for my ending transition points. 25 squares was very close. And again, I thought the transitions would be added to the ends of the segments I defined. But I still don't understand why a 2% gradient has to go negative to transition. I'll study on it.

    But again... what is "locking in" a grade?
    Last edited by 1611mac; February 11th, 2019 at 06:31 PM.
    TRS19 98592: Win 10, ASUS B450M-A/CSM, GTX 1060-6 Windforce, 1TB EVO SSD
    also a Mac install


  10. #25
    Join Date
    Oct 2011
    Location
    New Caledonia
    Posts
    2,618

    Default

    Quote Originally Posted by 1611mac View Post
    "Lock in a grade" - I've missed something. I didn't know anything could be "locked." Please explain.
    It's an alternative. It's the way that it would be done in the real world - glue your first section down firmly so that the sections you add will take the whole of the gradient transition. It's the way your customers might have used the 'grade' kits. But it's not practical in the virtual world because it makes the subsequent adjustment to spline points inconsistent. Of course, in the model world adjusting the equivalent of the spline points doesn't happen (unless you re-lay the whole thing). I guess it would be possible in the virtual world to make spline points immovable. Then you could fix a section of track to force the gradient adjustment into the 'next' section location. But it wouldn't be worth the tradeoff.
    Quote Originally Posted by 1611mac View Post
    And again, I thought the transitions would be added to the ends of the segments I defined.
    They aren't, for the sorts of reasons I stated above.
    Quote Originally Posted by 1611mac View Post
    But I still don't understand why a 2% gradient has to go negative to transition.
    Because the gradient transition is divided between the two segments. It really is as simple as that. It's no different then the model world, unless you are laying on a baseboard with the existing section firmly stuck down. If the existing section was only pinned at its ends (such as laying a viaduct) then it would bend down in the middle when you attached the next piece and bent it up. In Trainz the existing section is always pinned only at its end, so the middle will always bend down when you bend the next section up. But of course you get to choose the length of your sections, so creating the exact transition that you want is easy, unlike in the model world where you are restricted to setting the height for fixed lengths.

  11. #26
    Join Date
    Oct 2018
    Location
    USA - North Carolina
    Posts
    410

    Default

    Ahhh.... Got It! Thanks! Sorry to be such a pain. Thank you SailorDan (and all) for the help. I appreciate it!
    TRS19 98592: Win 10, ASUS B450M-A/CSM, GTX 1060-6 Windforce, 1TB EVO SSD
    also a Mac install


Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •