I do not know how to completely elaborate on this question, but is there a way for an intermediate signal to display the diverging aspect for the upcoming siding? In the scenario route I have, the intermediate will display the diverging aspect, but the signal for the siding should be a 4 light indicated Safetran CLS-20R (G, Y, L, R), but I am only using a 3 light aspect signal since a 4 light aspect has not been made yet. For the intermediate, I am using the Safetran CLight signal 06 left-diverging. When I place a train in front of it and the switch is set for the siding (left diverging), the signal gives me a non diverging aspect. I assume it is because the next signal which is for the siding is single headed? I would set up the signal for the siding with two signal heads, but it defeats the realism of what the route is based off of.
Thanks!!
Thanks!!