How would I Make the Terrain not do this so I can Have a Smooth Bridge Wall?

insanedude11

New member
c46d0cfe1a8f5dea188c02cb79cefa44
https://gyazo.com/c46d0cfe1a8f5dea188c02cb79cefa44
 
In Surveyor.

Click on the track tool.

Click on the Advanced tab below.

Click on the smooth spline height

Click on the track and the ground will raise up under the tracks.

Welcome to the forums.
 
Last edited:
Make sure your track ends just inside the edge of a square, and the smooth spline tool won't leave as big a gap. Alternatively (and more realistically) use an abutment track object. Worst case, build a retaining wall.
 
If you use the 5m grid the gap will be smaller but still not fill the gap. Use the same brickwork as the rest of the bridge to extend it that little bit further and bury it in the bank.
 
Smooth wall at bridge

Use "smooth spline" under the ground track, then move the spline point (the one that connects the track to the bridge end) toward the ground until the gap is filled.
 
Back
Top