Are there any Sherman Hill Sessions available for TS12?

We made six sessions (so far) for the Sherman Hill v2.1a (TS12 build 61388). Besides the first two, all other sessions only require DLS or built-in content.

The Ballast Turn
Drive to the Granite Quarry with an empty train of ballast hoppers, load them at the quarry and return to Cheyenne.
Requires some assets from USLW (the UP ballast hopper and some MOW vehicles).

Help the Aerotrain
Help the Aerotrain to pass the Hill, then help an eastbound over the hill and finally pick up a ballast train at Granite Quarry before returning to Cheyenne.
Requires the Aerotrain DLC and the EMD GP9 locomotives from Jointed Rail.

HollyFrontier
Switching operations at the east end of Cheyenne Yard and in the refinery.

The Portland Rose
Jump aboard UP844 and bring the Portland Rose all the way to Laramie.

Monolith Cement
Perform some switching operations in Laramie Yard, then deliver a cut of cars at the quarry at the end of the branch line, pick up a score of cement hoppers at the Monolith Cement plant and make up a departing train in the Laramie Yard.

The Heavy Metal Job
Switching operations at the west end of Cheyenne Yard. This is a short (30 minutes) introductory session.

You can find them at this page:

http://www.trainzitalia.com/forum/index.php?/files/category/18-routes-content-and-sessions/
 
Back
Top