.
Page 2 of 2 FirstFirst 12
Results 16 to 19 of 19

Thread: ATLS System

  1. #16
    Join Date
    Dec 2013
    Location
    United States of America
    Posts
    40

    Default

    Quote Originally Posted by mag315 View Post
    Have you tried the TRC system. It only uses one trigger and the length of time for opening and closing the gates in both directions is determined by how far the trigger is placed from the crossing. Much simpler. https://sites.google.com/site/trcv2e...0-introduction
    I recently started to use ATLS. After reading your post I tried TRC. TRC seems less complicated and has more features. Thanks for the information.

    ecco

  2. #17
    Join Date
    Nov 2006
    Location
    United Kingdom
    Posts
    969

    Default

    Quote Originally Posted by stouthm View Post
    Thank you stagecoach. That was the problem, the trigger was on the crossing tracks. With that problem solved you've just added a ton of work for me. I should go into my "Port Tillamook RR TANE" route, which is on the dls, and fix all those crossing, well over a hundred. Oh well, I'm retired and cold weather is on its way. Thanks again for all your help.
    I told you Stagecoach was an ATLS Super-User!

  3. #18

    Default

    I only use the tools that I have to manipulate what I want them to do. The creator of the tools are the masterminds behind it.

  4. #19
    Join Date
    Nov 2006
    Location
    United States of America, NJ
    Posts
    1,807

    Default

    I completely agree and there are many masterminds who are enriching this game/sim.
    pop pop

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •