MBTA ROUTE! (Rapid Transit, Commuter Rail)

Do you mean the Large White Signage or the red and white boards?

Just the baseboard!?

Many creators of urban elevated works have left the surrounding baseboards blank due to whatever reason ... I was curious if you too going to do this, or not!?

Kind regards

Ish
 
Just the baseboard!?

Many creators of urban elevated works have left the surrounding baseboards blank due to whatever reason ... I was curious if you too going to do this, or not!?

Kind regards

Ish

I am planning to paint the baseboards on the Red Line after placing the buildings, trees, and other stuff. I'll finish polishing up the Red Line after finishing the Franklin Branch of the Commuter Rail including the Southwest Corridor.
 
Hello Jamie,

If you're talking about those pieces that has the exit sign at the far end of the platforms those are all my items, which are all at the DLS!

---Items that has all red bricks!

I forgot the name I gave them, since it's been years! LOL

Kind Regards
Ish


Yes Ishy I am, but I've had a look using a half dozen different words I can think of, and I still can't find it in your assets. You only have about 8000 assets on the DLS lol

Do you have a KUID/name of Ish's footbridge Terence?

Jamie

EDIT: Found em. Route's looking promising mate, hope you see it to completion :)
 
Last edited:
Yes Ishy I am, but I've had a look using a half dozen different words I can think of, and I still can't find it in your assets. You only have about 8000 assets on the DLS lol

Do you have a KUID/name of Ish's footbridge Terence?

Jamie

EDIT: Found em. Route's looking promising mate, hope you see it to completion :)

Hello Jamie --

LOL, about my number assets!

Anyhow, head to the DLS --- uncheck all boxes --- check box for Ult version --- Now type Walkover and they'll appear in the search! Of course, u can do this in CM as well, using my username! LOL

A footnote: I use the term walkover because one of Auran's (N3V) item that was for this purpose was name the same, somewhat!

Those items where made many years ago, so they're difficult to find because made in a trainz era long ago!

Happy Trainzing! ;)

Ishy


Edit: just saw your edit remark! LOL
 
I am planning to paint the baseboards on the Red Line after placing the buildings, trees, and other stuff. I'll finish polishing up the Red Line after finishing the Franklin Branch of the Commuter Rail including the Southwest Corridor.

Thanks for the update!;)

Ish
 
South Station (In Progress)!!!

MBTA Route Update!!!

Here are some photos of South Station.















Amtrak and Boston's finest keeping commuters safe!!! (Credit to davesnow)




Workers at Tower 1 Interlocking
 
Last edited:
Southampton Yard!!!

Here are some photos of Southampton Yard!!!



View of Southampton Yard


Amtrak Maintenance Facility




Midday Storage

 
Last edited:
MBTA Route Update!!!

Here is some information on the MBTA Route!!!

Lines Included:

  • Rapid Transit
    • Green Line
    • Orange Line
    • Blue Line
    • Red Line (including Mattapan High-Speed Line)
  • Commuter Rail
    • Franklin Line
    • Fairmount Line

Rolling Stock:

The rolling stock for the MBTA Route



Commuter Rail:


  • Locomotive
    • MBTA F40PH Phase III by muttsmooch
      • Download from Jointed Rail
  • Bi-Level Cars
  • Single Cars

Rapid Transit:

Orange Line
  • NYCTA R46 Overhauled Subway Car by magicland
    • Download at Download Station
  • Possible New Cars
    • NYCTA R143 Subway Car by jennifer82c
      • Download at Download Station


Red Line
  • MARTA CQ312 by gandalf0444
    • Download at Trainz Commuter Rail
  • Boston Series 01800 by jaleel
    • Not sure where to download this train



Blue Line
  • CTA Series 3200 Series w/ Pantograph by klinger
    • Download at Trainz Commuter Rail or TPR Download Depot


Green Line
  • TYPE6 MBTA Rehab by lrv3400
    • Download at Download Station
  • TYPE7 MBTA Original by lrv3400
    • Download at Download Station
  • TYPE7 MBTA Repaint by lrv3400
    • Download at Download Station
Mattapan High-Speed Line
  • Type 5 PCC MBTA Orange by lrv3400
    • Download at Download Station
 
Last edited:
South Station Roof Question!!!

Hey guys,

Any suggestions on what to use for the roof of South Station?
I tried the concrete slabs but they're too wide and can't curve.

 
Last edited:
Layout Download

Where can I locate these layouts for download?

Here is the progress of the route so far (7/22/2017):
1. Franklin Line
-Readville to Norwood Central: Completed
-Windsor Gardens to Forge Park:
-Tracks laid
- Signals placed
-Stations placed

2. Southwest Corridor:
-Tracks Laid
-Signals placed
-Stations placed: Forest Hills (Needham), Ruggles, Back Bay
-Orange Line Tracks and Stations placed (Forest Hills to Back Bay)

3. Fairmount Branch:
-Tracks Laid
-Signals placed
-Stations placed; including Four Corners, Talbot Ave, Newmarket

4. Southampton Yard
-Tracks laid
-Signals placed

5. South Station
-Tracks laid
-Signals placed

6. Red Line
-Tracks laid (Alewife to Braintree/Ashmont)
-Stations placed
-Cabot Yard tracks laid

Next Steps: Complete Franklin Line, and Complete Southwest Corridor!
 
I believe that i asked this before in this thread, but can't locate the response. I am building a model railroad of the MBTA and i'm looking for an actual track map. I think someone had once told me where i could find one, but i didn't bookmark the website. Any help is greatly appreciated.
 
Photos Restored!!!

Everyone,

The screenshots has been restored on this thread using Postimage.org. Click on the thumbnails to get a larger view.

I will post screenshots on the progress in the Franklin Line later this month.
 
Back
Top