blueodessey
Well-known member
Good Evening Folks,
Just finished packing for our trip to Arizona, leaving early in the morning, thought I show you the Bridge construction I was doing tonight. Our Railroad is always busy doing something.....This is the new mainline I've been redoing and relocating further North of the Beach line on Waldavale. It's late at night and we are getting the heavy duty cranes to lift this Steel Structure in place. Weather is clear and it is a cool night, perfect for our heavy lift project, if all goes well, tomorrow morning will have a new Bridge over the Water Canal.
The mainline has been brought to where the Bridge is positioned we have our Test/work train ready to go across the Bridge once it is bolted in place. Below you see the night lights burning brightly as crews prepare for the big lift.
A nice star lit night as Crews drink Coffee to stay warm and I am there to make sure it all goes smoothly....We have a lot more Track to lay on the other side of the canal once this is finished.
I took a hike up the mountain here to catch this night picture, if they needed me, I had my Cell and Walkie Talkie.
Wow, it was only a few hours ago, as we watched the Bridge lifted and placed on it's new moorings. It Dawn and time to get some sleep after being on duty for 12 hours. Another crew comes on at 6:00AM and MOW will start laying new Tracks today linking up this new bridge, signals division is scheduled as well to drop equipment out here too. Probably a few weeks before we are completely operational from here to Outback Aussie Route.
I was able to get a Helicopter ride from a friend to look over our new bridge. I failed to mention, we also drilled a new tunnel below in the back area, you can see it from here. And it is a 2 track tunnel so we have one line hooked in now, will bring the other one after we get primary mainline in and opened.
Wishing you all a great week ahead.
Thanks for visiting here.
Just finished packing for our trip to Arizona, leaving early in the morning, thought I show you the Bridge construction I was doing tonight. Our Railroad is always busy doing something.....This is the new mainline I've been redoing and relocating further North of the Beach line on Waldavale. It's late at night and we are getting the heavy duty cranes to lift this Steel Structure in place. Weather is clear and it is a cool night, perfect for our heavy lift project, if all goes well, tomorrow morning will have a new Bridge over the Water Canal.
The mainline has been brought to where the Bridge is positioned we have our Test/work train ready to go across the Bridge once it is bolted in place. Below you see the night lights burning brightly as crews prepare for the big lift.
A nice star lit night as Crews drink Coffee to stay warm and I am there to make sure it all goes smoothly....We have a lot more Track to lay on the other side of the canal once this is finished.
I took a hike up the mountain here to catch this night picture, if they needed me, I had my Cell and Walkie Talkie.
Wow, it was only a few hours ago, as we watched the Bridge lifted and placed on it's new moorings. It Dawn and time to get some sleep after being on duty for 12 hours. Another crew comes on at 6:00AM and MOW will start laying new Tracks today linking up this new bridge, signals division is scheduled as well to drop equipment out here too. Probably a few weeks before we are completely operational from here to Outback Aussie Route.
I was able to get a Helicopter ride from a friend to look over our new bridge. I failed to mention, we also drilled a new tunnel below in the back area, you can see it from here. And it is a 2 track tunnel so we have one line hooked in now, will bring the other one after we get primary mainline in and opened.
Wishing you all a great week ahead.
Thanks for visiting here.