blueodessey
Well-known member
Excellent, OK, on the Pro Tracks, go to his Thread for MSGSapper and post your concern on Ultra setting, and when u do, make sure you put all the specs settings for your computer, like model, Graphics Card, type of Hard Drive....Spin or SSD model etc, so that they can help suggest a setting for you.....He and others are very knowledgeable on this type thing......MSGSapper has huge following of well schooled Members who understand this thing with PBR settings and TRS19 Memory configurations etc.....
I just bought new computer end of last year, ASUS ROG with 1050 GTI graphics with 2 GIGS of VRAM and 32 GIGS system ram, and I have no problem as long as I make sure I shut off other Ram hogging programs when I run Trainz ETC..
Now for the Route, you description on Mountains is exactly what I needed to know to proceed with building Valley FLoors and Mountains.....
I would like you to specify if you can, do you have any particular Large Steel Bridges or even Concrete etc, you like, so I can use them and position them in the Gorges etc,,,,I can do what I think looks OK, but I would rather use the ones you like,,,,,Thanks for excellent description of your wishes....
Now I will get busy with Mountain building, and I will send you changes (copy of updated CDP Route File) as I go along.,,,,Too see how you like....
I already added a few support tiles on sides in some places I thought needed them... And I spread one of the Curves out further too........
Enjoy your evening I think, I am 8 hrs later.....its 10 AM in the morning here.......
I have to leave for LA soon, but I wanted U to see this,,,,I stretched the mainline further over to give a better elongated curve here......Like I said, this is all very rough now,,,,It will look much different in 2 weeks...
Please look at mountains here in the back , I will fix this to, it is what I call the Cookie Cutter effect, so if take pictures now from train side u see this,,,,I will adjust and fix this.....It has to do with elevation and horizon end of Tiles view....
I redid the elevation as I found out on other end of merge, I could lower the initial Grade up in the mountains from 520 to 850, now we have even better Gradient...
Another part of same thing,,,I will smooth all this out,,,,And fill in deep valleys here too.......Still all rough from hacking and splicing etc.....
I have nice idea for something I think you really like too, I want to keep as surprise........
see you later sir......Take Care
I just bought new computer end of last year, ASUS ROG with 1050 GTI graphics with 2 GIGS of VRAM and 32 GIGS system ram, and I have no problem as long as I make sure I shut off other Ram hogging programs when I run Trainz ETC..
Now for the Route, you description on Mountains is exactly what I needed to know to proceed with building Valley FLoors and Mountains.....
I would like you to specify if you can, do you have any particular Large Steel Bridges or even Concrete etc, you like, so I can use them and position them in the Gorges etc,,,,I can do what I think looks OK, but I would rather use the ones you like,,,,,Thanks for excellent description of your wishes....
Now I will get busy with Mountain building, and I will send you changes (copy of updated CDP Route File) as I go along.,,,,Too see how you like....
I already added a few support tiles on sides in some places I thought needed them... And I spread one of the Curves out further too........
Enjoy your evening I think, I am 8 hrs later.....its 10 AM in the morning here.......
I have to leave for LA soon, but I wanted U to see this,,,,I stretched the mainline further over to give a better elongated curve here......Like I said, this is all very rough now,,,,It will look much different in 2 weeks...
Please look at mountains here in the back , I will fix this to, it is what I call the Cookie Cutter effect, so if take pictures now from train side u see this,,,,I will adjust and fix this.....It has to do with elevation and horizon end of Tiles view....
I redid the elevation as I found out on other end of merge, I could lower the initial Grade up in the mountains from 520 to 850, now we have even better Gradient...
Another part of same thing,,,I will smooth all this out,,,,And fill in deep valleys here too.......Still all rough from hacking and splicing etc.....
I have nice idea for something I think you really like too, I want to keep as surprise........
see you later sir......Take Care
Last edited: