The Illinois Railway Museum Route

Here are the rest of the screenshots

92c1907e8148e65477d555d56f048a9d.png


43e8cc06c3f42c97bfd2db86fdc6498e.png


92e4e2b4effd86ec45daefa5f0a6534e.png


66b9e036a733b577326037092e3b7716.png


295764a0d7b436eb011c8abaead978e3.png


1e95ca651ec1b50fadff6e2032eff536.png


57a2df3a0dcfede406258dbf1aad52d5.png


A new station sign for the small platform at Seemann Road made by Bendorsey.
cd949c3fecad87f1948a951cf0e0d29b.png
 
Hello Everyone, Ive made a massive amount of progress on my route today so lets get started with this presentation shall we...

Did a huge amount of work today on my route. Im become a master at planting flora items onto the route. Its looking more and more like the real IRM with every bit of scenery added. Still got a long way to go but if I keep this up I might have all of the scenery in place before this year is out.

96f7f630243b97bcb590076b277db089.png


6ae58ea2bd65a284da84d5acae987177.png


a8edb27a98b5f39b9bd3dcd12aa66752.png


116f3906d9eac7d2c2db9088425c36be.png


603432385985b88c364f0d92b7456725.png


00c2c9df550441615dcbad64f9b3d548.png


425a69bb0d9d903bc57d1ceae2320198.png


8d45dcf9e33c7d8ecc9b5eafec6a70d0.png


1d18e01ccf3742d71a55d44fa9698fd7.png


1a06befb6157596e686f80596a0e728b.png


More screenshots coming in the next post.
 
Here are the final set of screenshots from todays progress on the route.

1d621931fb18931d85ea79724531fba8.png


16b4c9917426ac02edc76c86faeae916.png


2d466bb463c723c268b570c54f33eff9.png


d1f0d83877b751627ad63b1222159b34.png


c1a15403f900fe16aa9f04daa63c04e1.png


0fb6c7fd8fbcf6dd8faceb5891176a00.png


f7061ee8db68607bfb2affcf8902cae2.png


e88a86f445fbd55f290fe4d0fd9fd23a.png


e0c4a987a9e7b57fdc9430d4fea0654a.png


357d6107b38ee15f1d9f87dadf25f04b.png


Thats all for todays progress so until next time stay tuned for more.
 
So when are you going to start grading the track down?

Rock On!
~Dusten
That all comes after I place all of the scenery down (Both Custom and Generic) and when I'm satisfied with the track work (such as spline points) which will probably won't be done until possibly by the end of this year, if I keep up amount of progress to almost a daily basis. As I said then I can finally remove the Google map images because by then I would not need them anymore and then that will give me the freedom to grade the track.
 
Just trying to help here, but you can just tap te spline point with the adjust height tool, and it should smooth everything out ;)
 
Hi everyone, Im back from my IRM trip and I had a great time and I would also like to also mention that besides me making more visits to the Illinois Railway Museum next year I will also be volunteering at IRM next year for the Steam Department since its time to start helping them out besides just making visits and I want to be able to work on Steam Locomotives while Im still young so be sure to look for me in the steam shops next year.

Anyway back to my project, I would first like to announce thats from now on whatever BlackDiamond1964 makes that relates to IRM will be posted here so be sure to look out for updates on that here from now on. I will also like to mention that I finally got in contact with my route DEM creator and he sent me a brand new DEM route of just the Illinois Railway Museum Grounds and its Museum Mainline only so I can start work on it as soon as I post this message, this new DEM is a big improvement over the last one because the track elevation in this one is better laid out so Track work is now less of a hassle and It requires less work at editing terrain for the track hight.

Now for from some updates from my team of content creators who are helping me out with this project (And I have no limit for the number of content creator I need to work on this project so Im always open for new project members) so lets begin...

PWeiser is working on creating the Illinois Central Electric MU Rapid Transit Cars that are the only surviving examples of these types of cars and they are also operational.

The Car Body
(Removed Screenshot)

The trucks
(Removed Screenshot)

The real cars
(Removed Screenshot)

Now we move on to our Jointed Rail Star member in this project Simulatortrain who has started work on the first set of IRM freight equipment for the project and its this Rock Island Wooden Auto Boxcar

The Model (so Far)
(Removed Screenshot)

The Real Car
(Removed Screenshot)

Finally BenjaminW is working on creating a working model of ATSF Heavy Northern #2903 (while the real one is not operational at IRM) I on the other hand plan on making whatever piece of rolling stock IRM has thats on Static display currently to be operational in Trainz because I not only have intentions to just use the content for just the museum route but I want people to also use it on any route so its more practical if I make every static item operational so if you want to run this engine on the Mojave Sub Route for example you can if I make it an operational model so it works out for everyone.

Bens model (So Far)
(Removed Screenshot)

The Real One
(Removed Screenshot)

Again every piece of rolling stock that will be produce (no matter who will make them) will have ARN so the model is not limited to just one number. Thats all for now but expect some more progress from this moment onwards.
I was reading some old posts which I did not find until about a month or two ago, I completely never noticed the 2903 whenever I visited the museum. My favorites, are Milw 265, Frisco 1630, CB&Q 9911A, Electroliner and the Twins. I have seen all 5 of these trains/engines, etc. But the one thing that is my MOST favorite which was not mentioned, are the 9 or 10 Metra Highliner cars. When Metra put 10 old ex-IC Highliner cars out of service, they were moved by a Metra SW1500. 1 of the cars rests somewhere at a station which I do not know, so the IRM has 9 of them sitting in a hidden spot away from the public. It is still unknown why they are not in the open, but getting back on topic: How's the progress with the ATSF 4-8-4?
 
Good Morning everyone. Before I go work on my route, I have a little surprise to show you today. Coming soon to Jointed Rail by Wearsprada is this C&NW GP7 Unit that I commissioned. This is another GP7 that is present in IRM's vast collection. He did a fantastic job on it. When released it will be payware.

2c9272e6b61f578b1a303c5a65162094.png
 
Because the guys at Jointed Rail, like artists, have to pay bills, eat, feed their families, etc.

@Matt: That CNW Geep looks sharp!
 
Last edited:
And we now go back to your regular schedule programing.... LOL okay guys back on topic, sorry but It will be a little late to show off todays progress on the route today due to the Chicago Cubs game against the Pittsburgh Pirates, I'm watching right now but while you all wait here is what Jointed Rail has made so far thats C&NW thats present in the IRM collection.

f317a3c257239739c7daf117affd6197.png
 
Back
Top