That would need a completely different configuration, as the centre track is needed by the crane. One crane could not unload 2 trains either at the same time without massive scripting changes.
Check out intermodal yards on Google Earth and I don't think you will find any in real life that work that way.
What I suggested was to have ramps side by side. This would be an advantage once JR setup the cranes to handle different products.
cheers,
Mike
Check out intermodal yards on Google Earth and I don't think you will find any in real life that work that way.
What I suggested was to have ramps side by side. This would be an advantage once JR setup the cranes to handle different products.
cheers,
Mike