.

Search:

Type: Posts; User: Railroader1970

Search: Search took 0.02 seconds.

  1. Yeah I have an 80 to 85 mile route planned like I...

    Yeah I have an 80 to 85 mile route planned like I said and will split it up into two sections. This way I can do more diverges from the mainline to small towns and add other details. Of course I can...
  2. I used to be an actual railway worker. I was...

    I used to be an actual railway worker. I was employed in the Diesel Locomotive & Rail Car Facility. I did maintenance, minor repairs, fueling and switching of locomotives. I guess now I'm, more or...
  3. I know what you mean. What's always interesting...

    I know what you mean. What's always interesting is when I have lots of free time and work on a route, 5 hours go by in a flash. Feels like 1 or 2 hours. There are huge blocks of hills or flat lands...
  4. Thanks for all of the input everyone. I may do a...

    Thanks for all of the input everyone. I may do a Pt1 route that is 40mls long, then a Pt2 route of the other 40mls. This way I can do both routes separately with details and maybe upload them to the...
  5. Ouch.. Ok, thanks. - RR70

    Ouch.. Ok, thanks.

    - RR70
  6. What Should Be The Maximum Miles Used On A Trainz Route?

    Is there any general rule about this? I'm working on a route that is supposed to go from Nisku AB to Red Deer AB which is around 80mls. At 2.5 baseboards that roughly make up a mile, you can imagine...
Results 1 to 6 of 6