.

Search:

Type: Posts; User: MikeBr

Search: Search took 0.01 seconds.

  1. Drive/Navigate to station V2, Unable to schedule this rule

    I have enabled both "Drive to" and "Navigate to " station V2 but when I try to add either to a driver setup all I get is the station name and nothing more so it fails. I have tried using various...
  2. Using ASB to control passage through a lock

    Hi,
    I am trying to control the passage of vessels passing through a canal lock. I started with just a crossing with ASB triggers and controller. All worked as expected. I then added a lock and...
  3. Replies
    2
    Views
    397

    Hi,I have tried ATLS to control the lift bridges...

    Hi,I have tried ATLS to control the lift bridges and they appear to work very well. I first tried using ATLS with the bridge on a piece of dummy track to which I attached the controller. As the...
  4. Replies
    2
    Views
    397

    Controlling canal lift bridges

    Hi,
    I am working on a route of the Oxford canal which has a number of lift bridges. These bridges are narrow and only one vessel at a time is allowed to pass through. My problem is controlling when...
  5. Thread: Ok I done it

    by MikeBr
    Replies
    7
    Views
    1,480

    TANE SP2 does not save the property changes

    I have tried the changing of the property layer for each section of track, which works fine on SP2, but when I save the files, the changes do not get saved. I have to change something else, like the...
  6. Replies
    15
    Views
    11,071

    I have just upgraded from Vista to the release...

    I have just upgraded from Vista to the release version of Windows7. I too had to upgrade my ATI drivers to get opengl loaded. Trainz 2009 runs without problems but Trainz 2006 won't shut down. I have...
  7. Replies
    24
    Views
    4,911

    I am also looking for a dual gauge track spline...

    I am also looking for a dual gauge track spline but I have the added problem of finding/creating track as designed by Brunel. He used track with a wide base and cross ties every 2 or 3 feet. No...
Results 1 to 7 of 14