.
No More Results
About RHKluckhohn

Basic Information

About RHKluckhohn
Location:
Seattle, WA, United States of America
Interests:
Railroading, photography, genealogy
Occupation:
Police dispatcher (Retired)

Signature



Together in Trainzing!

Statistics


Total Posts
Total Posts
1,191
Posts Per Day
0.21
General Information
Last Activity
Today 03:31 AM
Join Date
November 21st, 2007
Referrals
0

1 Friend

  1. Robertbc6 Robertbc6 is offline

    Trainz Veteran

    Robertbc6
Showing Friends 1 to 1 of 1
View RHKluckhohn's Blog

Recent Entries

FOR SESSION BUILDERS: Another Replaced Grade Crossing

by RHKluckhohn on October 26th, 2022 at 12:26 AM
Quote Originally Posted by RHKluckhohn View Post
In addition, the Hickory Street CNW crossing by the Land O' Lakes mill has been replaced. The HP Trains crossing does not play well with TRC. Any of your trains starting ON the crossing should be moved to safety nearby in version 7 before you install version 8, and put back after.

I think I've done all I can on this route and the sessions. It'll be put on the DLS in the next day or two. Then I can go off to some quiet place and try to regain my sanity.

8B~b
Categories
Uncategorized

VERSION :8 ROUTE WORK COMPLETED!

by RHKluckhohn on August 13th, 2022 at 01:21 AM
Today I am calling the route complete.
  • All portals except CNW-Janesville are now fully landscaped.
  • A board has been added in west Mayville.


  • A board has been added in west Brownsville.
  • A board has been added east of the Prairie Road crossing.
  • Three boards have been added to the west edge between Prairie Road and South Byron
  • Brownsville Track 2 is now posted for 10 MPH.
  • All grade crossings are TRC-controlled except Milwaukee W. Grove and Prairie Road, which are ATLS.

Read More

Updated September 8th, 2022 at 12:19 AM by RHKluckhohn

Categories
CONSTRUCTION

Desiderata For Ver. 8

by RHKluckhohn on December 30th, 2020 at 12:55 AM
Should I ever get around to it:
  • Remove the horn triggers on the Goldencow driveway
  • Extend baseboards and scenic them at each hanging portal
  • Add baseboards on the west side as needed to conceal the end of the world
  • Correct 25 mph warning EB approach to Jones to 30 warning
  • Replace missing 25 mph advance sign EB for South Byron
  • Replace missing WB whistle post W of Horicon St, Mayville
  • New baseboard in Mayville, west side, replace existing dorfpano which lights up at night
  • Add

Read More

Updated April 20th, 2022 at 12:00 AM by RHKluckhohn

Categories
CONSTRUCTION

Fond Du Lac Route ver. 7 Uploaded

by RHKluckhohn on December 7th, 2020 at 03:13 AM
Quote Originally Posted by RHKluckhohn View Post
FDL Fond Du Lac Branch version 7 has been uploaded and will be available "soon."

NOTICE TO SESSION BUILDERS: The Brownsville Main St. crossing has been shifted 1-2 feet west and lowered several inches. That straightens the line through the crossing. If any of your sessions have consists starting between the platform or the derail and the west switch you should check to make sure they are on the track.

NOTICES TO CREWS:

  1. The signals at South Fond du Lac

Read More

Categories
CONSTRUCTION , OPERATION

Version :6 Work In Progress

by RHKluckhohn on July 21st, 2020 at 03:28 AM
  • First thing done was the safety items. The east whistle posts are back in South Amboy - replaced the old wood posts with new type - and the speed limit on the Metalcraft spur.
  • The mileposts were off by 2/10 mile. Ugh. However, they are now prototypically correct and the signals have been renumbered to match. That was one of the two most time-consuming jobs.
  • Converting crossings from ATLS to Attilacrossings was the other major job. Only those in shunting areas were addressed. That

Read More

Updated July 30th, 2020 at 01:51 AM by RHKluckhohn (Additional info.)

Categories
CONSTRUCTION