.
No Recent Activity
About RHKluckhohn

Basic Information

About RHKluckhohn
Location:
Seattle, WA, United States of America
Interests:
Railroading, photography, genealogy
Occupation:
Police dispatcher (Retired)

Statistics


Total Posts
Total Posts
264
Posts Per Day
0.07
General Information
Last Activity
Today 02:00 AM
Join Date
November 21st, 2007
Referrals
0
View RHKluckhohn's Blog

Recent Entries

Computer Crash and Burn

by RHKluckhohn on January 16th, 2018 at 02:48 AM
15 January 2018

Saturday the 13th, for sure. Testing different mice with the "Schedule Rule" to see if mouse driver was the issue. Switch mouse and cold boot, "Windows Cannot find Boot Device." The repair shop says Thursday at the earliest for diagnosis. Then we'll find out how much of the last week's work has been lost.


Categories
CONSTRUCTION

WIP: FDL:NE, Fond Du Lac for T:ANE

by RHKluckhohn on January 7th, 2018 at 05:19 AM
6 January 2018

Today downloaded :12 from the DLS along with Morning Connection. Immediately got the red bug; the b___dy XING 1 US popped up again! I missed the one on the easternmost crossing on the SOO. Also found a whole mess of missing assets that were UltraTreez. Thought I'd got them all, but nooooo. In addition, the subterranean track on the SOO led me to realize that there was an issue with the SOO's freeway bridge.

  • Once again it proved impossible to remove the XING by

Read More

Categories
CONSTRUCTION , OPERATION

FDL12: The Friday Sessions

by RHKluckhohn on January 2nd, 2018 at 04:53 AM
The week's work cycle is now complete with the release of
FDL12 Friday AM
FDL12 Friday Freight for Fond Du Lac
FDL12 Friday Home To Horicon
FDL12 Friday In West Yard

and the HTML support file FDL12-Messages-Friday. They are all approved and should be on the DLS within hours.

"Support has ended" for the FDL12 Free Session. It's a holdover from 2009 and the versions of Quickdrive in 12 and T:ANE render it obsolete.

Industries

Read More

Categories
CONSTRUCTION

Fond Du Lac Updates

by RHKluckhohn on December 22nd, 2017 at 11:34 PM
Quote Originally Posted by RHKluckhohn View Post
Quote Originally Posted by RHKluckhohn View Post
Fond Du Lac Branch :12 is on the DLC.

Other changes are detailed on the Fond Du Lac Branch blog. Some major ones:
  • Addition of two baseboards to eliminate the visible baseboard edge at the north end of Limestone Ridge, one ditto the south end of the garbage landfill across from that and two north of South Byron at the S-curve crossing to extend the world a bit.
  • Work on road crossings, trees and vegetation and platforms to improve T:ANE compatibility.
Should

Read More

Categories
Uncategorized

FDL12 :12 RELEASED with Updated Sessionz

by RHKluckhohn on December 22nd, 2017 at 11:33 PM
Quote Originally Posted by RHKluckhohn View Post
Fond Du Lac Branch :12 is on the DLC.

Operating Changes:

  • Signalling in Downtown Fond Du Lac has been revised and simplified and signals are more indicative.
  • The Mercury Marine siding has been extended 5 meters for more room at the sand dump. Operating sessions affected have been updated.
  • The Brenner Tank siding S-curve is removed and the junction moved south about 5 meters.
  • Iron Ridge (House) Track 3 East has an invisible speed sign for road speed as you enter the main.

Read More

Categories
Uncategorized