.

Recent Blogs Posts

  1. Western Trainz 16 Mile Canyon: Eagles Nest and Francis

    I have continued working on the 16 Mile canyon route focussing on the Eagles Nest area as well as the substations at Francis,MT (otherwise known as josephine) and Loweth,MT. Connecting these two sections with textures/details etc. is my next goal before I start down towards Lombard in the coming weeks and months. The Substation models and Textures you see are both in-house models made by kgp and add to the atmosphere of the route.

    As always if you would like any more information check ...
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	20190514002411_1.jpg 
Views:	23 
Size:	95.7 KB 
ID:	1854   Click image for larger version. 

Name:	20190513225517_1.jpg 
Views:	23 
Size:	81.6 KB 
ID:	1855   Click image for larger version. 

Name:	20190510001847_1.jpg 
Views:	27 
Size:	98.6 KB 
ID:	1856  
  2. Western Trainz 16 Mile Canyon

    The Past week i have started my Project that i am contribuiting towards the Western Trainz team, which i am delighted to now be a part of. This Route runs from just east of Bruno,MT to a point just west of Lombard, MT. Along this route, you will be able to experience iconic sights such as the Bridge at Lombard, the breath-taking trestle and tunnel at the Eagles nest (just north of Francis, MT) and the twists and turns of 16 mile canyon. As well as this, the roughly 65 mile route features trackside ...
  3. FDL FRIDAY AM For T:ANE

    The session FDL Friday AM has been ported to T:ANE, uploaded and approved. It will be available for download within hours.

    Due to a power shortage at Horicon, today's early patrol will be Eastbound sans caboose. First we have to make up the train and take care of an odd job in the West Yard, then do some light work on our way to Horicon.

    This is the first import from 12 to T:ANE SP3. The experience has improved in that there are fewer ghost consists needing attention; the
    ...
  4. FDL Fond Du Lac For T:ANE - Route Update

    Version :2 has been uploaded to the DLC and should be available to all within a day or so.

    Track alignment is unchanged and the sessions I've uploaded for it all work with the changes without issues.

    Chief improvement is the replacement of nearly all track with procedural track and removal of nearly all the separate frog assets. Management also decided to upgrade the Rock River trestle at Mayville with a much more substantial structure, in view of the increasingly heavy
    ...
  5. Thursday AM Patrol West for T:ANE

    FDL Thursday AM Patrol West has been uploaded, approved and should be available within hours. It's in Build 4.5.

    Here you get to "patrol" (Milwaukee talk) the entire line and have work to do in several locations. Takes a couple of hours.

    Although basically the same as the 12 session, it was necessary to substitute the U30b loco for the SD9, which is not currently available in T:ANE. The advantage is, the U-boat is a much more powerful loco. In SP2, the front
    ...
Page 1 of 8 123 ... LastLast