.

FOND DU LAC BRANCH

Trials, Tribulations, Triumphs and Thoughts on creating and running this route in Trainz 2009 and 12, and now T:ANE.

  1. Version :6 Work In Progress

    • First thing done was the safety items. The east whistle posts are back in South Amboy - replaced the old wood posts with new type - and the speed limit on the Metalcraft spur.
    • The mileposts were off by 2/10 mile. Ugh. However, they are now prototypically correct and the signals have been renumbered to match. That was one of the two most time-consuming jobs.
    • Converting crossings from ATLS to Attilacrossings was the other major job. Only those in shunting areas were addressed. That
    ...

    Updated July 30th, 2020 at 01:51 AM by RHKluckhohn (Additional info.)

    Categories
    CONSTRUCTION