.

FOND DU LAC BRANCH

Trials, Tribulations, Triumphs and Thoughts on creating and running this route in Trainz 2009 and 12, and now T:ANE.

  1. Desiderata For Ver. 8

    Should I ever get around to it:
    • Remove the horn triggers on the Goldencow driveway
    • Extend baseboards and scenic them at each hanging portal
    • Add baseboards on the west side as needed to conceal the end of the world
    • Correct 25 mph warning EB approach to Jones to 30 warning

    Updated March 17th, 2021 at 03:02 AM by RHKluckhohn

    Categories
    CONSTRUCTION
  2. Fond Du Lac Route ver. 7 Uploaded

    Quote Originally Posted by RHKluckhohn View Post
    FDL Fond Du Lac Branch version 7 has been uploaded and will be available "soon."

    NOTICE TO SESSION BUILDERS: The Brownsville Main St. crossing has been shifted 1-2 feet west and lowered several inches. That straightens the line through the crossing. If any of your sessions have consists starting between the platform or the derail and the west switch you should check to make sure they are on the track.

    NOTICES TO CREWS:

    1. The signals at South Fond du Lac
    ...
    Tags: fond du lac Add / Edit Tags
    Categories
    CONSTRUCTION , OPERATION