Maybe they're doing it to sell it for scrap and get money to pay for these outrages gas prices! LOL
Ish
Back when I was in college, this one city ended up getting in a whole HOST of trouble over a supposed abandoned line.
To make a long story short, the city decided to widen their main road through town, and proceded to tear down this plate girder bridge (ballasted type) that crossed over the road. They even went so far as to tear out the old concrete pilings and rip out all the track back through the city, probably all told a good two or three miles of trackage.
What makes the story so funny, is how things came together. In the spring of 95, an old iron bridge and trestle had suffered damage during a flood. So NS started working to rebuild it. They diverted their traffic to Atlanta through another route while this was going on, causing this particular line to fall into apparent abandonment. All told, it was expected to take close to a year to rebuild, but various problems and setbacks pushed that timeline up to almost eighteen months.
In the fall of 95, about 8 months after the last train had come through, the small city I was living in decided that it was time to widen the main drag through town. The main road was a battered old two lane, and it ducked under an aging plate girder bridge built back in the Southern days. As part of the widening project, the city announced that they were going to remove the old bridge, and open that part of the highway to four lane traffic. Their reasoning being that since the railroad was obviously abandoned now...
NS got wind of this and sent lawyers to warn the city to stop, but the city flat ignored them. Claming "imminent domain" allowed them to sieze the land anyway. (It doesn't but that's beside the point.) Long story short the whole thing went to court. The kicker is that the same day that the judge hands down an order to stop any and all work on that section, was the same day that the city's contractors tore down the old bridge.
In the end, they had to pay about fifteen million dollars to NS for the destruction of the bridge and trackgage through town, and allow the railroad to rebuild the bridge. NS put it back pretty much as it was, even forcing the city into having a short two lane section through the underpass. They claimed (NS that is) that property lines on either side of the bridge area prevented them from widening it, though most people (myself included) felt they did it out of spite.
lol nice try, but thats not where he is. Now two idiots that do this. The people who owned the track where most saying somthing like this in their heads ".............%#$@ ARE YOU DOING ON THE TRACKS AND ....... WHAT......NOW.......OH COME ON WE WHERE GOING TO GET NEW TRACKS NEXT MONTH AND NOW........^&*%#......*^#^.....THE &^&$$^#^&.....TRACKS..:'( !!!"We now know where Charlie Sheen is!!!!
Jamie