Timber Ridge Line

Klinger

The Chicago CTA guy
here are some more recent pictures, It contains about 10 maybe 12 miles of mainline track, all in 36" Narrow Gauge, and several Spur Lines. There are 3 portals, one at each end point of the Track

There is a BIG farm in the middle, Owned by Me (Carrys my last name) as well as 3 towns, although only one has been built so far, the other are just stations

Screenshot_441-1.jpg


Screenshot_444.jpg


Screenshot_448.jpg


Screenshot_454.jpg


Screenshot_456.jpg


Screenshot_462.jpg


Screenshot_472.jpg




I also have made my own Custom Locomotive skin for this layout, to go with the Large Farm

Screenshot_494-1.jpg



and for more detail on the Town of Timber Ridge, I direct you here

http://www.youtube.com/watch?v=0b136IN_utc
 
yea i know alan, the session i made has then random start time rule on it, besides it hides the fact most of the areas i photographed dont have trees


Spiffy, this is the second time ive built this route. i spent four months working on it at first, over 30 miles of mainline, then it was lost to a computer glitch. i was determined not to let the idea of a large narrow gauge route go to waste

It will be done when its done, I have been working very hard on it recently, all the track work (unless i think of something else) is done, most of the ground textures are done, and all thats left to do is speed limits, and scenery. Please be pacient, i have well over 7 months invested in the project now
 
Whoah

I understand it is a lot of work, and I jumped a little to fast to conclusions. I wasn't sure if this was a route for yourself or if it was a route for the public,
 
Back
Top