TGV not going posted speed...

ccanupii

New member
In a route in progress I have built a dedicated line for a TGV transport between two main cities. I post speed signs and when the train passes the speed limit is indicated on the heads up display. (300km/h signs and 300km/h shown as limit). The AI driver will not get the train up to this speed and obtains a max speed of 165km/h. I have tried various speed signs from 250km/h to 999km/h but the max speed of the AI remains around 165km/h. There is only one TGV on the line with no tie ins and there are no signals on the line. Any suggestions or thoughts?
 
In a route in progress I have built a dedicated line for a TGV transport between two main cities. I post speed signs and when the train passes the speed limit is indicated on the heads up display. (300km/h signs and 300km/h shown as limit). The AI driver will not get the train up to this speed and obtains a max speed of 165km/h. I have tried various speed signs from 250km/h to 999km/h but the max speed of the AI remains around 165km/h. There is only one TGV on the line with no tie ins and there are no signals on the line. Any suggestions or thoughts?

You need to add signals... an unsignalled route will always drive at half speed (as if under a caution aspect).

Paul
 
Back
Top